Chapter 9 · Implementing Strategy

Cards

01What are the four strategy-implementation steps?

Operational goals; operational plans; implement and monitor; learn from strategy in action.

Implementation includes learning that can revise future formulation.

Dyck et al. (2026), Chapter 9, 9.1
02What is an operational goal?

An outcome for a department, workgroup or individual, typically within one year.

Operational goals translate strategic direction into nearer-term results.

Dyck et al. (2026), Chapter 9, 9.2
03What is a performance standard?

A metric for assessing how well work is done.

Standards make a particular aspect of accomplishment assessable.

Dyck et al. (2026), Chapter 9, 9.2
04Expand SMART using this textbook's terminology.

Specific, Measurable, Achievable, Results-Based, Time-Specific.

The source uses Results-Based for R, not the alternative Relevant expansion.

Dyck et al. (2026), Chapter 9, Table 9.1
05Expand SMART 2.0.

Significant, Meaningful, Agreed-upon, Relevant, Timely.

This framework makes motivation, purpose, participation and stakeholder needs explicit.

Dyck et al. (2026), Chapter 9, Table 9.2
06Why must achievable goals still be challenging?

Easy targets do not provide the same performance stimulus; impossible ones can cause disengagement.

The chapter describes stretch within reach rather than maximum difficulty.

Dyck et al. (2026), Chapter 9, 9.2.1
07What is goal displacement?

Focusing on narrow goals so much that more important purposes are neglected.

Output targets can crowd out dignity, quality or long-term maintenance.

Dyck et al. (2026), Chapter 9, 9.2.2
08What does an operational plan specify?

Activities, timing and required resources for achieving a goal.

A desired result is different from the steps used to accomplish it.

Dyck et al. (2026), Chapter 9, 9.3
09What are the five operational planning checklist items?

Actions; constraints; needed resources; resource availability; order, timing and milestones.

The sequence checks both feasibility and coordination.

Dyck et al. (2026), Chapter 9, Table 9.3
10What is a standing plan?

A plan for recurring activities or situations.

SOPs, policies and rules support routine programmed decisions.

Dyck et al. (2026), Chapter 9, 9.3.1
11What is a standard operating procedure?

A prescribed sequence for a recurring work task.

Its stepwise instruction differs from a broad policy guideline.

Dyck et al. (2026), Chapter 9, 9.3.1
12How does a policy differ from a rule?

A policy guides decisions; a rule prescribes permitted or required behavior.

Both are standing plans but differ in specificity.

Dyck et al. (2026), Chapter 9, 9.3.1
13What is a contingency plan?

A prearranged response to a possible future disruption.

It prepares managers for events that could invalidate current plans.

Dyck et al. (2026), Chapter 9, 9.3.2
14What three actions limit crisis impacts?

Prevention, preparation and containment.

Avoid/minimize the event, arrange response capacity, then respond promptly to limit harm.

Dyck et al. (2026), Chapter 9, 9.3.2
15What is planned success?

The plan is followed and the goal is met.

Both implementation compliance and the desired result occur.

Dyck et al. (2026), Chapter 9, 9.4
16What is accidental success?

The goal is met even though the plan is not followed.

Unplanned actions or external conditions may explain the achievement.

Dyck et al. (2026), Chapter 9, 9.4
17What is planning failure?

The plan is followed but the goal is not met.

The plan or goal may need revision even when members complied.

Dyck et al. (2026), Chapter 9, 9.4
18What is a bungled attempt?

Neither the plan is followed nor the goal is met.

Both planning/implementation and outcomes require investigation.

Dyck et al. (2026), Chapter 9, 9.4
19What is strategic learning?

Using insights from actual strategy to improve intended strategy.

Learning can change the next goals, plans and SWOT assumptions.

Dyck et al. (2026), Chapter 9, 9.5
20How does the content school differ from the process school?

Content stresses analysis and top-down planning; process stresses iterative learning from action.

Both perspectives can contribute to effective strategic management.

Dyck et al. (2026), Chapter 9, 9.5
21What is deliberate strategy?

Intended strategy that is actually implemented.

It is the realized part of what managers originally planned.

Dyck et al. (2026), Chapter 9, 9.5.1
22What is emergent strategy?

Unanticipated actions that become part of the strategy carried out.

Frontline and stakeholder learning can create new patterns.

Dyck et al. (2026), Chapter 9, 9.5.1
23What composes actual strategy?

Deliberate and emergent strategy.

Actual action may include both planned and unplanned elements.

Dyck et al. (2026), Chapter 9, 9.5.1
24What is a stakeholder map?

A description of venture resources, key relationships and industry forces.

It supports strategy formulation, implementation and reformulation.

Dyck et al. (2026), Chapter 9, 9.6
25Why are stakeholder map arrows bidirectional?

The venture influences stakeholders and stakeholders influence the venture.

Relationships create dynamic opportunities and constraints in both directions.

Dyck et al. (2026), Chapter 9, 9.6